The coordination of just-in-time production and transportation in a network of partially independent facilities to guarantee timely delivery to distributed customers is one of the most challenging aspect of supply chain management. From a theoretical perspective, the timely production/distribution can be viewed as a hybrid combination of planning, scheduling and routing problems, each notoriously affected by nearly prohibitive combinatorial complexity. From a practical viewpoint, the problem calls for a trade-off between risks and profits. This paper focuses on the ready-mixed concrete delivery: in addition to the mentioned complexity, strict time-constraints forbid both earliness and lateness of the supply. After developing a detailed model of the considered problem, we propose a novel meta-heuristic approach based on a hybrid genetic algorithm combined with constructive heuristics. A detailed case study derived from indus- trial data is used to illustrate the potential of the proposed approach.

Genetic algorithms for supply-chain scheduling: A case study in the distribution of ready-mixed concrete / Naso, David; Surico, M.; Turchiano, Biagio; Kaymak, U.. - In: EUROPEAN JOURNAL OF OPERATIONAL RESEARCH. - ISSN 0377-2217. - 177:3(2007), pp. 2069-2099. [10.1016/j.ejor.2005.12.019]

Genetic algorithms for supply-chain scheduling: A case study in the distribution of ready-mixed concrete

NASO, David;TURCHIANO, Biagio;
2007-01-01

Abstract

The coordination of just-in-time production and transportation in a network of partially independent facilities to guarantee timely delivery to distributed customers is one of the most challenging aspect of supply chain management. From a theoretical perspective, the timely production/distribution can be viewed as a hybrid combination of planning, scheduling and routing problems, each notoriously affected by nearly prohibitive combinatorial complexity. From a practical viewpoint, the problem calls for a trade-off between risks and profits. This paper focuses on the ready-mixed concrete delivery: in addition to the mentioned complexity, strict time-constraints forbid both earliness and lateness of the supply. After developing a detailed model of the considered problem, we propose a novel meta-heuristic approach based on a hybrid genetic algorithm combined with constructive heuristics. A detailed case study derived from indus- trial data is used to illustrate the potential of the proposed approach.
2007
Genetic algorithms for supply-chain scheduling: A case study in the distribution of ready-mixed concrete / Naso, David; Surico, M.; Turchiano, Biagio; Kaymak, U.. - In: EUROPEAN JOURNAL OF OPERATIONAL RESEARCH. - ISSN 0377-2217. - 177:3(2007), pp. 2069-2099. [10.1016/j.ejor.2005.12.019]
File in questo prodotto:
Non ci sono file associati a questo prodotto.

I documenti in IRIS sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.

Utilizza questo identificativo per citare o creare un link a questo documento: https://hdl.handle.net/11589/5431
Citazioni
  • Scopus 169
  • ???jsp.display-item.citation.isi??? 127
social impact