Four-dimensional (4D) simulation could reduce the uncertainty relating to the building processes increasing the visibility of the construction workflows and supporting the detection of the potential conflicts and safety hazards at the construction site. The aim of the research is to provide an automatic approach for the real-time scheduling through the Building Information Modelling (BIM) methodology in order to select the best scheduling alternative. The availability of information relating to the duration of the work tasks execution, within a unique digital building model, allows performing 4D modelling in the early building design stages in order to enable stakeholders to assist decision-making and to optimise the site layout plans and the work tasks themselves. The object identification codes (ID) and the implementation of the temporal parameters linked to the building information model elements, within the 3D model, make possible the automatic execution of the 4D BIM. This methodological approach could decrease the very time-consuming activities of data entry that are usually conducted at the end of the construction (building) stages. Furthermore, this procedure allows increased the coherence of information among different design activities, such as between modelling and scheduling that are often found to be asynchronous and affected by inconsistencies

Automatic workflow for 4D-BIM based modelling / Cavalliere, Carmine; Dell'Osso, Guido Raffaele; Maria Angela, Leogrande. - (2017), pp. 405-409. (Intervento presentato al convegno PHI 2017-Progress(es)-Theories and practices tenutosi a Bari; Taranto nel October 4-7, 2017).

Automatic workflow for 4D-BIM based modelling

Cavalliere, Carmine;Dell'Osso, Guido Raffaele;
2017-01-01

Abstract

Four-dimensional (4D) simulation could reduce the uncertainty relating to the building processes increasing the visibility of the construction workflows and supporting the detection of the potential conflicts and safety hazards at the construction site. The aim of the research is to provide an automatic approach for the real-time scheduling through the Building Information Modelling (BIM) methodology in order to select the best scheduling alternative. The availability of information relating to the duration of the work tasks execution, within a unique digital building model, allows performing 4D modelling in the early building design stages in order to enable stakeholders to assist decision-making and to optimise the site layout plans and the work tasks themselves. The object identification codes (ID) and the implementation of the temporal parameters linked to the building information model elements, within the 3D model, make possible the automatic execution of the 4D BIM. This methodological approach could decrease the very time-consuming activities of data entry that are usually conducted at the end of the construction (building) stages. Furthermore, this procedure allows increased the coherence of information among different design activities, such as between modelling and scheduling that are often found to be asynchronous and affected by inconsistencies
2017
PHI 2017-Progress(es)-Theories and practices
978-0-8153-7415-2
Automatic workflow for 4D-BIM based modelling / Cavalliere, Carmine; Dell'Osso, Guido Raffaele; Maria Angela, Leogrande. - (2017), pp. 405-409. (Intervento presentato al convegno PHI 2017-Progress(es)-Theories and practices tenutosi a Bari; Taranto nel October 4-7, 2017).
File in questo prodotto:
Non ci sono file associati a questo prodotto.

I documenti in IRIS sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.

Utilizza questo identificativo per citare o creare un link a questo documento: https://hdl.handle.net/11589/117288
Citazioni
  • Scopus ND
  • ???jsp.display-item.citation.isi??? ND
social impact