This paper focuses on the modeling and analysis of complex production systems such as Steelmaking Continuous Casting (SM-CC) plants. To this aim, the discrete event simulation is employed to verify the dynamics and the performance of the SM-CC systems. First, the manufacturing system activities are described in detail by the Unified Modeling Language (UML). Then, the UML activity diagrams are translated in a discrete event simulation model. Hence, a real system involving a SM-CC plant located in Italy is considered and analyzed. Some simulation results show that the proposed modeling and analysis approach can be effectively used to improve and assess the performance of the system.

A Simulation Based Analysis of Production Scheduling in a Steelmaking and Continuous Casting Plant / Fanti, Maria Pia; Iacobellis, G.; Rotunno, G.; Ukovich, W.. - (2013), pp. 150-155. (Intervento presentato al convegno IEEE International Conference on Automation Science and Engineering, CASE 2013 tenutosi a Madison, Wisconsin nel August 17-20, 2013) [10.1109/CoASE.2013.6654020].

A Simulation Based Analysis of Production Scheduling in a Steelmaking and Continuous Casting Plant

FANTI, Maria Pia;
2013-01-01

Abstract

This paper focuses on the modeling and analysis of complex production systems such as Steelmaking Continuous Casting (SM-CC) plants. To this aim, the discrete event simulation is employed to verify the dynamics and the performance of the SM-CC systems. First, the manufacturing system activities are described in detail by the Unified Modeling Language (UML). Then, the UML activity diagrams are translated in a discrete event simulation model. Hence, a real system involving a SM-CC plant located in Italy is considered and analyzed. Some simulation results show that the proposed modeling and analysis approach can be effectively used to improve and assess the performance of the system.
2013
IEEE International Conference on Automation Science and Engineering, CASE 2013
978-1-4799-1515-6
A Simulation Based Analysis of Production Scheduling in a Steelmaking and Continuous Casting Plant / Fanti, Maria Pia; Iacobellis, G.; Rotunno, G.; Ukovich, W.. - (2013), pp. 150-155. (Intervento presentato al convegno IEEE International Conference on Automation Science and Engineering, CASE 2013 tenutosi a Madison, Wisconsin nel August 17-20, 2013) [10.1109/CoASE.2013.6654020].
File in questo prodotto:
Non ci sono file associati a questo prodotto.

I documenti in IRIS sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.

Utilizza questo identificativo per citare o creare un link a questo documento: https://hdl.handle.net/11589/16511
Citazioni
  • Scopus 9
  • ???jsp.display-item.citation.isi??? ND
social impact