This paper deals with the scheduling of operations in a Steelmaking and Continuous Casting (SM-CC) plant. In particular, we consider a real case study of an integrated plant located in the North of Italy. First, we describe in details the SM-CC process of the considered system by using the Unified Modeling Language. Second, we focus on the schedule of casts on the continuous casting machine that is subject to different types of setup operations. With the objective of minimizing the maximum completion time, the schedule of the continuous casting machine is modeled by a Mixed Integer Linear Programming formulation. An example enlightens how a proper scheduling of the casts is of basic importance to obtain good system performances.

Production Scheduling in a Steelmaking and Continuous Casting Plant: a Case Study / Fanti, Maria Pia; Rotunno, G.; Stecco, G.; Ukovich, W.. - (2013), pp. 3580-3585. (Intervento presentato al convegno IEEE International Conference on Robotics and Automation, ICRA 2013 tenutosi a Karlsruhe, Germany nel May 6-10, 2013) [10.1109/ICRA.2013.6631079].

Production Scheduling in a Steelmaking and Continuous Casting Plant: a Case Study

FANTI, Maria Pia;
2013-01-01

Abstract

This paper deals with the scheduling of operations in a Steelmaking and Continuous Casting (SM-CC) plant. In particular, we consider a real case study of an integrated plant located in the North of Italy. First, we describe in details the SM-CC process of the considered system by using the Unified Modeling Language. Second, we focus on the schedule of casts on the continuous casting machine that is subject to different types of setup operations. With the objective of minimizing the maximum completion time, the schedule of the continuous casting machine is modeled by a Mixed Integer Linear Programming formulation. An example enlightens how a proper scheduling of the casts is of basic importance to obtain good system performances.
2013
IEEE International Conference on Robotics and Automation, ICRA 2013
978-1-4673-5641-1
Production Scheduling in a Steelmaking and Continuous Casting Plant: a Case Study / Fanti, Maria Pia; Rotunno, G.; Stecco, G.; Ukovich, W.. - (2013), pp. 3580-3585. (Intervento presentato al convegno IEEE International Conference on Robotics and Automation, ICRA 2013 tenutosi a Karlsruhe, Germany nel May 6-10, 2013) [10.1109/ICRA.2013.6631079].
File in questo prodotto:
Non ci sono file associati a questo prodotto.

I documenti in IRIS sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.

Utilizza questo identificativo per citare o creare un link a questo documento: https://hdl.handle.net/11589/21884
Citazioni
  • Scopus 3
  • ???jsp.display-item.citation.isi??? 1
social impact