This paper presents a train scheduling and a rescheduling models based on the generation of an alternative graph of the railway network. In the first model, the train scheduling problem has been solved to define the optimal timetable for a set of trains with the objective to minimize the travel times of passengers to reach their destination, outlining the related sequence of nodes and arcs of the graph to be covered by each group of passengers. Subsequently, a train rescheduling model is applied on an optimal timetable became infeasible due to unpredicted failures or disturbances introduced on the network. In this second approach, the objective is restore the railway service quality by reducing the delays for trains and passengers.The main contribution of this paper is to implement railway scheduling and rescheduling problem by linear programming formulations introducing in the second approach the innovative concept to prioritize the train that can access on the block section in case of conflicts on the network. The performances of the solution methods have been tested on real train timetable data related to a portion of railway in Liguria Region, in Italy.

Train scheduling and rescheduling model based oncustomer satisfaction. Application to Genoa railway network / Donzella, F.; del Cacho Estil-Les, M. A.; Bersani, C.; Sacile, R.; Zero, L.. - (2018), pp. 8428780.593-8428780.600. (Intervento presentato al convegno 2018 13th System of Systems Engineering Conference, SoSE 2018) [10.1109/SYSOSE.2018.8428780].

Train scheduling and rescheduling model based oncustomer satisfaction. Application to Genoa railway network

del Cacho Estil-Les M. A.
;
2018-01-01

Abstract

This paper presents a train scheduling and a rescheduling models based on the generation of an alternative graph of the railway network. In the first model, the train scheduling problem has been solved to define the optimal timetable for a set of trains with the objective to minimize the travel times of passengers to reach their destination, outlining the related sequence of nodes and arcs of the graph to be covered by each group of passengers. Subsequently, a train rescheduling model is applied on an optimal timetable became infeasible due to unpredicted failures or disturbances introduced on the network. In this second approach, the objective is restore the railway service quality by reducing the delays for trains and passengers.The main contribution of this paper is to implement railway scheduling and rescheduling problem by linear programming formulations introducing in the second approach the innovative concept to prioritize the train that can access on the block section in case of conflicts on the network. The performances of the solution methods have been tested on real train timetable data related to a portion of railway in Liguria Region, in Italy.
2018
2018 13th System of Systems Engineering Conference, SoSE 2018
978-1-5386-4876-6
Train scheduling and rescheduling model based oncustomer satisfaction. Application to Genoa railway network / Donzella, F.; del Cacho Estil-Les, M. A.; Bersani, C.; Sacile, R.; Zero, L.. - (2018), pp. 8428780.593-8428780.600. (Intervento presentato al convegno 2018 13th System of Systems Engineering Conference, SoSE 2018) [10.1109/SYSOSE.2018.8428780].
File in questo prodotto:
Non ci sono file associati a questo prodotto.

I documenti in IRIS sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.

Utilizza questo identificativo per citare o creare un link a questo documento: https://hdl.handle.net/11589/264983
Citazioni
  • Scopus 4
  • ???jsp.display-item.citation.isi??? 4
social impact