Building Information Modeling (BIM) is an innovative approach based on a virtual model, which allows to manage all the information about the building. This approach is applicable to all the phases of the building process, but many surveys show the lack of BIM implementation in the use e maintenance phases. The BIM use in the management phase represents a unexpressed potentiality, a differentiating factor compared to Product Lifecycle Management (PLM), a holistic approach able to oversee the whole life cycle of a product and the information connected with it, widespread and consolidated in the manufacturing sector. Starting from this assumptions, in an empirical study, the paper presents a qualitative investigation into the current situation of the processes management of the constructed heritage in a French real estate company. The case study proposes the integration of the PLM and BIM approaches, that could be defined as Building Lifecycle Management (BLM), in order to close the gap of the traditional method.

From Traditional Construction Industry Process Management to Building Lifecycle Management / Malagnino, Ada; Mangialardi, Giovanna; Zavarise, Giorgio; Corallo, Angelo. - ELETTRONICO. - 517:(2017), pp. 335-344. (Intervento presentato al convegno PLM 2017 | IFIP International Conference on Product Lifecycle Management) [10.1007/978-3-319-72905-3_30].

From Traditional Construction Industry Process Management to Building Lifecycle Management

Mangialardi, Giovanna;
2017-01-01

Abstract

Building Information Modeling (BIM) is an innovative approach based on a virtual model, which allows to manage all the information about the building. This approach is applicable to all the phases of the building process, but many surveys show the lack of BIM implementation in the use e maintenance phases. The BIM use in the management phase represents a unexpressed potentiality, a differentiating factor compared to Product Lifecycle Management (PLM), a holistic approach able to oversee the whole life cycle of a product and the information connected with it, widespread and consolidated in the manufacturing sector. Starting from this assumptions, in an empirical study, the paper presents a qualitative investigation into the current situation of the processes management of the constructed heritage in a French real estate company. The case study proposes the integration of the PLM and BIM approaches, that could be defined as Building Lifecycle Management (BLM), in order to close the gap of the traditional method.
2017
PLM 2017 | IFIP International Conference on Product Lifecycle Management
9783319729046
9783319729053
https://link.springer.com/chapter/10.1007/978-3-319-72905-3_30
From Traditional Construction Industry Process Management to Building Lifecycle Management / Malagnino, Ada; Mangialardi, Giovanna; Zavarise, Giorgio; Corallo, Angelo. - ELETTRONICO. - 517:(2017), pp. 335-344. (Intervento presentato al convegno PLM 2017 | IFIP International Conference on Product Lifecycle Management) [10.1007/978-3-319-72905-3_30].
File in questo prodotto:
Non ci sono file associati a questo prodotto.

I documenti in IRIS sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.

Utilizza questo identificativo per citare o creare un link a questo documento: https://hdl.handle.net/11589/279326
Citazioni
  • Scopus 2
  • ???jsp.display-item.citation.isi??? 1
social impact