The permanent way being laid for the urban rail project "Metropolitana Bari Centrale - Quartiere San Paolo" in Bari, Italy, is of the Margaritelli slab track type, whereby prefabricated unstressed reinforced concrete slabs are laid unconnected on elastic matting over a cement layer. To analyse the performance capability of this permanent way type, extended-time threshold testing was carried out in the laboratory. The article describes the tests carried out and the results obtained.

Performance capability testing of a slab track system / Monaco, V.; Monaco, P.. - In: DER EISENBAHNINGENIEUR. - ISSN 0013-2810. - STAMPA. - 55:4(2004), pp. 24-31.

Performance capability testing of a slab track system

Monaco, P.
2004-01-01

Abstract

The permanent way being laid for the urban rail project "Metropolitana Bari Centrale - Quartiere San Paolo" in Bari, Italy, is of the Margaritelli slab track type, whereby prefabricated unstressed reinforced concrete slabs are laid unconnected on elastic matting over a cement layer. To analyse the performance capability of this permanent way type, extended-time threshold testing was carried out in the laboratory. The article describes the tests carried out and the results obtained.
2004
Performance capability testing of a slab track system / Monaco, V.; Monaco, P.. - In: DER EISENBAHNINGENIEUR. - ISSN 0013-2810. - STAMPA. - 55:4(2004), pp. 24-31.
File in questo prodotto:
Non ci sono file associati a questo prodotto.

I documenti in IRIS sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.

Utilizza questo identificativo per citare o creare un link a questo documento: https://hdl.handle.net/11589/8427
Citazioni
  • Scopus 0
  • ???jsp.display-item.citation.isi??? ND
social impact