An experimental test campaign has been carried out on the track equipment system for "50 UNI" rails with reinforced concrete precast formation laid down on elastomeric mattress. This system will be utilised for the preparation of the Bari-S. Paolo underground railway superstructure. Some experimental test have been carried out on prototypes in order to verify the performances of the proposed system. The paper illustrates the results of the tests and gives some design directives deriving from the analysis of the experimental tests.
Experimental enquire on reinforced concrete precast formations for "50 UNI" rails / Monaco, P; Monaco, V. - In: INGEGNERIA FERROVIARIA. - ISSN 0020-0956. - STAMPA. - 59:5(2004), pp. 435-442.
Experimental enquire on reinforced concrete precast formations for "50 UNI" rails
Monaco P;
2004-01-01
Abstract
An experimental test campaign has been carried out on the track equipment system for "50 UNI" rails with reinforced concrete precast formation laid down on elastomeric mattress. This system will be utilised for the preparation of the Bari-S. Paolo underground railway superstructure. Some experimental test have been carried out on prototypes in order to verify the performances of the proposed system. The paper illustrates the results of the tests and gives some design directives deriving from the analysis of the experimental tests.I documenti in IRIS sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.