Attenzione: i dati modificati non sono ancora stati salvati. Per confermare inserimenti o cancellazioni di voci è necessario confermare con il tasto SALVA/INSERISCI in fondo alla pagina
POLITECNICO DI BARI - Catalogo dei prodotti della Ricerca
The high pseudo-rapidity region of the CMS muon system is covered by Cathode Strip Chambers (CSC) only and lacks redundant coverage despite the fact that it is a challenging region for muons in terms of backgrounds and momentum resolution. In order to maintain good efficiency for the muon trigger in this region additional RPCs are planned to be installed in the two outermost stations at low angle named RE3/1 and RE4/1. These stations will use RPCs with finer granularity and good timing resolution to mitigate background effects and to increase the redundancy of the system.
R&D towards the CMS RPC Phase-2 upgrade / Fagot, A.; Cimmino, A.; Crucy, S.; Gul, M.; Rios, A. A. O.; Tytgat, M.; Zaganidis, N.; Aly, S.; Assran, Y.; Radi, A.; Sayed, A.; Singh, G.; Abbrescia, M.; Iaselli, G.; Maggi, M.; Pugliese, G.; Verwilligen, P.; Van Doninck, W.; Colafranceschi, S.; Sharma, A.; Benussi, L.; Bianco, S.; Piccolo, D.; Primavera, F.; Bhatnagar, V.; Kumari, R.; Mehta, A.; Singh, J.; Ahmad, A.; Ahmed, W.; Asghar, M. I.; Awan, I. M.; Hoorani, H. R.; Muhammad, S.; Shah, M. A.; Shahzad, H.; Cho, S. W.; Choi, S. Y.; Hong, B.; Kang, M. H.; Lee, K. S.; Lim, J. H.; Park, S. K.; Kim, M. S.; Gouzevitch, M.; Grenier, G.; Lagarde, F.; Laktineh, I. B.; Carpinteyro Bernardino, S.; Uribe Estrada, C.; Pedraza, I.; Carrillo Moreno, S.; Vazquez Valencia, F.; Pant, L. M.; Buontempo, S.; Cavallo, N.; Esposito, M.; Fabozzi, F.; Lanza, G.; Orso, I.; Lista, L.; Meola, S.; Merola, M.; Paolucci, P.; Thyssen, F.; Braghieri, A.; Magnani, A.; Montagna, P.; Riccardi, C.; Salvini, P.; Vai, I.; Vitulo, P.; Ban, Y.; Qian, S. J.; Choi, M.; Choi, Y.; Goh, J.; Kim, D.; Aleksandrov, A.; Hadjiiska, R.; Iaydjiev, P.; Rodozov, M.; Stoykova, S.; Sultanov, G.; Vutova, M.; Dimitrov, A.; Litov, L.; Pavlov, B.; Petkov, P.; Bagaturia, I.; Lomidze, D.; Avila, C.; Cabrera, A.; Sanabria, J. C.; Crotty, I.; Vaitkus, J.. - In: JOURNAL OF INSTRUMENTATION. - ISSN 1748-0221. - ELETTRONICO. - 11:(2016). [10.1088/1748-0221/11/09/C09017]
R&D towards the CMS RPC Phase-2 upgrade
Fagot, A.;Cimmino, A.;Crucy, S.;Gul, M.;Rios, A. A. O.;Tytgat, M.;Zaganidis, N.;Aly, S.;Assran, Y.;Radi, A.;Sayed, A.;Singh, G.;Abbrescia, M.;Iaselli, G.;Maggi, M.;Pugliese, G.;Verwilligen, P.;Van Doninck, W.;Colafranceschi, S.;Sharma, A.;Benussi, L.;Bianco, S.;Piccolo, D.;Primavera, F.;Bhatnagar, V.;Kumari, R.;Mehta, A.;Singh, J.;Ahmad, A.;Ahmed, W.;Asghar, M. I.;Awan, I. M.;Hoorani, H. R.;Muhammad, S.;Shah, M. A.;Shahzad, H.;Cho, S. W.;Choi, S. Y.;Hong, B.;Kang, M. H.;Lee, K. S.;Lim, J. H.;Park, S. K.;Kim, M. S.;Gouzevitch, M.;Grenier, G.;Lagarde, F.;Laktineh, I. B.;Carpinteyro Bernardino, S.;Uribe Estrada, C.;Pedraza, I.;Carrillo Moreno, S.;Vazquez Valencia, F.;Pant, L. M.;Buontempo, S.;Cavallo, N.;Esposito, M.;Fabozzi, F.;Lanza, G.;Orso, I.;Lista, L.;Meola, S.;Merola, M.;Paolucci, P.;Thyssen, F.;Braghieri, A.;Magnani, A.;Montagna, P.;Riccardi, C.;Salvini, P.;Vai, I.;Vitulo, P.;Ban, Y.;Qian, S. J.;Choi, M.;Choi, Y.;Goh, J.;Kim, D.;Aleksandrov, A.;Hadjiiska, R.;Iaydjiev, P.;Rodozov, M.;Stoykova, S.;Sultanov, G.;Vutova, M.;Dimitrov, A.;Litov, L.;Pavlov, B.;Petkov, P.;Bagaturia, I.;Lomidze, D.;Avila, C.;Cabrera, A.;Sanabria, J. C.;Crotty, I.;Vaitkus, J.
2016-01-01
Abstract
The high pseudo-rapidity region of the CMS muon system is covered by Cathode Strip Chambers (CSC) only and lacks redundant coverage despite the fact that it is a challenging region for muons in terms of backgrounds and momentum resolution. In order to maintain good efficiency for the muon trigger in this region additional RPCs are planned to be installed in the two outermost stations at low angle named RE3/1 and RE4/1. These stations will use RPCs with finer granularity and good timing resolution to mitigate background effects and to increase the redundancy of the system.
I documenti in IRIS sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.
Utilizza questo identificativo per citare o creare un link a questo documento: https://hdl.handle.net/11589/91456
Citazioni
2
2
social impact
Conferma cancellazione
Sei sicuro che questo prodotto debba essere cancellato?
simulazione ASN
Il report seguente simula gli indicatori relativi alla propria produzione scientifica in relazione alle soglie ASN 2023-2025 del proprio SC/SSD. Si ricorda che il superamento dei valori soglia (almeno 2 su 3) è requisito necessario ma non sufficiente al conseguimento dell'abilitazione. La simulazione si basa sui dati IRIS e sugli indicatori bibliometrici alla data indicata e non tiene conto di eventuali periodi di congedo obbligatorio, che in sede di domanda ASN danno diritto a incrementi percentuali dei valori. La simulazione può differire dall'esito di un’eventuale domanda ASN sia per errori di catalogazione e/o dati mancanti in IRIS, sia per la variabilità dei dati bibliometrici nel tempo. Si consideri che Anvur calcola i valori degli indicatori all'ultima data utile per la presentazione delle domande.
La presente simulazione è stata realizzata sulla base delle specifiche raccolte sul tavolo ER del Focus Group IRIS coordinato dall’Università di Modena e Reggio Emilia e delle regole riportate nel DM 589/2018 e allegata Tabella A. Cineca, l’Università di Modena e Reggio Emilia e il Focus Group IRIS non si assumono alcuna responsabilità in merito all’uso che il diretto interessato o terzi faranno della simulazione. Si specifica inoltre che la simulazione contiene calcoli effettuati con dati e algoritmi di pubblico dominio e deve quindi essere considerata come un mero ausilio al calcolo svolgibile manualmente o con strumenti equivalenti.