February 14th 2013 marked the end of the first period of running of the Large Hadron Collider (LHC) and the start of a two-year break from operation (LS1) aimed at consolidating both the accelerator as well as the detectors. By the end of LS1, the LHC is expected to provide collisions at 13 Tev. While, by 2020, the ultimate instantaneous luminosity is expected to be 10(34)/cm(2)/s. To prepare for this scenario, the Resistive Plate Chamber system at the CMS experiment is planning several detector maintainance and consolidation interventions. These include High Voltage and Low Voltage system reparations, gas leak identification and reparation, signal channel connectivity and functionality. Commissioning and upgrade plans for the existing CMS RPC system are presented here.
CMS RPC commissioning of the existing detector during the long shutdown / Cimmino, A.; Ban, Y.; Cai, J.; Li, Q.; Liu, S.; Qian, S.; Wang, D.; Xu, Z.; Zhang, F.; Choi, Y.; Kim, D.; Goh, J.; Choi, S.; Hong, B.; Kang, J. W.; Kang, M.; Kwon, J. H.; Lee, K. S.; Lee, S. K.; Park, S. K.; Pant, L. M.; Mohanty, A. K.; Chudasama, R.; Singh, J. B.; Bhatnagar, V.; Mehta, A.; Kumar, R.; Cauwenbergh, S.; Costantini, S.; Crucy, S.; Fagot, A.; Garcia, G.; Ocampo, A.; Poyraz, D.; Salva, S.; Thyssen, F.; Tytgat, M.; Zaganidis, N.; Doninck, W. V.; Cabrera, A.; Chaparro, L.; Gomez, J. P.; Gomez, B.; Sanabria, J. C.; Avila, C.; Ahmad, A.; Muhammad, S.; Shoaib, M.; Hoorani, H.; Awan, I.; Ali, I.; Ahmed, W.; Asghar, M. I.; Shahzad, H.; Sayed, A.; Ibrahim, A.; Aly, S.; Assran, Y.; Radi, A.; Elkafrawy, T.; Sharma, A.; Colafranceschi, S.; Abbrescia, M.; Calabria, C.; Colaleo, A.; Iaselli, G.; Loddo, F.; Maggi, M.; Nuzzo, S.; Pugliese, G.; Radogna, R.; Venditti, R.; Verwilligen, P.; Benussi, L.; Bianco, S.; Piccolo, D.; Paolucci, P.; Buontempo, S.; Cavallo, N.; Merola, M.; Fabozzi, F.; Iorio, O. M.; Braghieri, A.; Montagna, P.; Riccardi, C.; Salvini, P.; Vitulo, P.; Vai, I.; Magnani, A.; Dimitrov, A.; Litov, L.; Pavlov, B.; Petkov, P.; Aleksandrov, A.; Genchev, V.; Iaydjiev, P.; Rodozov, M.; Sultanov, G.; Vutova, M.; Stoykova, S.; Hadjiiska, R.; Ibargüen, H. S.; Morales, M. I. P.; Bernardino, S. C.; Bagaturia, I.; Tsamalaidze, Z.; Crotty, I.; Kim, M. S.. - In: JOURNAL OF INSTRUMENTATION. - ISSN 1748-0221. - ELETTRONICO. - 9:(2014). [10.1088/1748-0221/9/10/C10043]
CMS RPC commissioning of the existing detector during the long shutdown
A. Cimmino;Y. Ban;J. Cai;Q. Li;S. Liu;S. Qian;D. Wang;Z. Xu;F. Zhang;Y. Choi;D. Kim;J. Goh;S. Choi;B. Hong;J. W. Kang;M. Kang;J. H. Kwon;K. S. Lee;S. K. Lee;S. K. Park;L. M. Pant;A. K. Mohanty;R. Chudasama;J. B. Singh;V. Bhatnagar;A. Mehta;R. Kumar;S. Cauwenbergh;S. Costantini;S. Crucy;A. Fagot;G. Garcia;A. Ocampo;D. Poyraz;S. Salva;F. Thyssen;M. Tytgat;N. Zaganidis;W. V. Doninck;A. Cabrera;L. Chaparro;J. P. Gomez;B. Gomez;J. C. Sanabria;C. Avila;A. Ahmad;S. Muhammad;M. Shoaib;H. Hoorani;I. Awan;I. Ali;W. Ahmed;M. I. Asghar;H. Shahzad;A. Sayed;A. Ibrahim;S. Aly;Y. Assran;A. Radi;T. Elkafrawy;A. Sharma;S. Colafranceschi;M. Abbrescia;C. Calabria;A. Colaleo;G. Iaselli;F. Loddo;M. Maggi;S. Nuzzo;G. Pugliese;R. Radogna;R. Venditti;P. Verwilligen;L. Benussi;S. Bianco;D. Piccolo;P. Paolucci;S. Buontempo;N. Cavallo;M. Merola;F. Fabozzi;O. M. Iorio;A. Braghieri;P. Montagna;C. Riccardi;P. Salvini;P. Vitulo;I. Vai;A. Magnani;A. Dimitrov;L. Litov;B. Pavlov;P. Petkov;A. Aleksandrov;V. Genchev;P. Iaydjiev;M. Rodozov;G. Sultanov;M. Vutova;S. Stoykova;R. Hadjiiska;H. S. Ibargüen;M. I. P. Morales;S. C. Bernardino;I. Bagaturia;Z. Tsamalaidze;I. Crotty;M. S. Kim
2014-01-01
Abstract
February 14th 2013 marked the end of the first period of running of the Large Hadron Collider (LHC) and the start of a two-year break from operation (LS1) aimed at consolidating both the accelerator as well as the detectors. By the end of LS1, the LHC is expected to provide collisions at 13 Tev. While, by 2020, the ultimate instantaneous luminosity is expected to be 10(34)/cm(2)/s. To prepare for this scenario, the Resistive Plate Chamber system at the CMS experiment is planning several detector maintainance and consolidation interventions. These include High Voltage and Low Voltage system reparations, gas leak identification and reparation, signal channel connectivity and functionality. Commissioning and upgrade plans for the existing CMS RPC system are presented here.
I documenti in IRIS sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.
Utilizza questo identificativo per citare o creare un link a questo documento: https://hdl.handle.net/11589/77207
Citazioni
0
0
social impact
Conferma cancellazione
Sei sicuro che questo prodotto debba essere cancellato?
simulazione ASN
Il report seguente simula gli indicatori relativi alla propria produzione scientifica in relazione alle soglie ASN 2023-2025 del proprio SC/SSD. Si ricorda che il superamento dei valori soglia (almeno 2 su 3) è requisito necessario ma non sufficiente al conseguimento dell'abilitazione. La simulazione si basa sui dati IRIS e sugli indicatori bibliometrici alla data indicata e non tiene conto di eventuali periodi di congedo obbligatorio, che in sede di domanda ASN danno diritto a incrementi percentuali dei valori. La simulazione può differire dall'esito di un’eventuale domanda ASN sia per errori di catalogazione e/o dati mancanti in IRIS, sia per la variabilità dei dati bibliometrici nel tempo. Si consideri che Anvur calcola i valori degli indicatori all'ultima data utile per la presentazione delle domande.
La presente simulazione è stata realizzata sulla base delle specifiche raccolte sul tavolo ER del Focus Group IRIS coordinato dall’Università di Modena e Reggio Emilia e delle regole riportate nel DM 589/2018 e allegata Tabella A. Cineca, l’Università di Modena e Reggio Emilia e il Focus Group IRIS non si assumono alcuna responsabilità in merito all’uso che il diretto interessato o terzi faranno della simulazione. Si specifica inoltre che la simulazione contiene calcoli effettuati con dati e algoritmi di pubblico dominio e deve quindi essere considerata come un mero ausilio al calcolo svolgibile manualmente o con strumenti equivalenti.